Category: Highways
A14 C2H Road Closures week commending 27th May 2019
A14 C2H Road Closures week commencing 20th May 2019
Road Works and events in and around Willingham 16th to 31st March 2019
Just a reminder that this only includes works that are due to start between 16th – 31st May and longer term works that are still in progress will have been included on previous reports. Alternatively please refer to http://www.roadworks.org which will include details on emergency roadworks.
A14 C2H Road Closures, week commencing 13th May 2019
A14 C2H Road Closures, week commending 6th May 2019
Highways Events
Highways Events in and around Willingham 1st to 15th May 2019
A14 C2H road closures week commencing 29th April 2019
A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
Construction work on the new A14 Cambridge to Huntingdon scheme is underway. We are currently carrying out a variety of tasks for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.
For this week, the planned closures are:
Full closures
Monday 29 April to Friday 3 May (five nights)
• A1 northbound between Buckden and Alconbury
Vehicles will travel east on the A428, north on the A1198, west on the A14 and then north on the A14 link road to re-join the A1
• A1 southbound between Alconbury and Buckden
Vehicles will be diverted south on the A14 link road, then east on the A14, south on the A1198 and west on the A428 to re-join the A1
• A14 eastbound between Ellington junction 20 and Brampton Hut junction 21
Vehicles will be diverted east on the A605 then south on the A1(M) to the A605 to re-join the A14 at junction 21.
Non motorway traffic will be diverted east at Wooley Hill, then north on Ellington Road and Wooley Road to re-join the A14.
• A14 westbound between Six Mile Bottom junction 36 and Histon junction 32
Motorway traffic will travel south on the A11, west on the A505 and then north on the M11.
Non motorway traffic will diverted on local roads through Cambridge
• A14 eastbound Bar Hill junction 29 exit slip
Vehicles wishing to leave the A14 at Bar Hill will need to exit the road at Swavesey junction 28 and return on the A14 westbound
Monday 29 April to Wednesday 1 May (three nights)
• A14 eastbound Histon junction 32 to Milton junction 33
Vehicles will be diverted along Kings Hedges Road to re-join the A14
Monday 29 (one night)
• Dry Drayton Road, Oakington
Wednesday 1 and Friday 3 May (two nights)
• Dry Drayton Road overbridge
For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-about/ , or stay updated by following us on https://twitter.com/a14c2h and https://en-gb.facebook.com/A14C2H/.
A14 C2H Road Closures week commencing 15th April 2019
A14 C2H Road Closures – week commencing 1st April and 8th April 2019
A1198 Godmanchester traffic delays
Please be advised that there are delays of around 45 minutes on the A1198 tailing back through Godmanchester due to works being undertaken by Anglian water.
Below is a map of the affected area

A14 C2H Road Closures week commencing 25th March 2019
A14 C2 Road Closures – week commencing 18th March 2019
Additional closure:
Wednesday 20 – Thursday 21 (two nights)
- High Street Boxworth, between A14 site compound and Cambridge Services roundabout
Cancelled closures:
Saturday 23 6am – Monday 25 5am
- A1 southbound Brampton Hut to Buckden
Saturday 23 – Sunday 24 (two nights)
- A14 eastbound Swavesey junction 28 to Bar Hill junction 29
- A14 westbound Bar Hill junction 29 to Swavesey junction 28