Category: Highways
Road works and events in and around Willingham 16th June to 30th June 2019
A14 CH2 Road closures week commencing 17th June 2019

A14 C2H Road Closures week commencing 10th June 2019
Changes to the Bar Hill Junction of the A14
We’ve just issued the latest news release, about the upcoming changes at the Bar Hill junction of the A14. You can read this here.
Roadworks and Events in and around Willingham for 12 months from 6th June 2019
A14 C2H Road Closures week commending 27th May 2019
A14 C2H Road Closures week commencing 20th May 2019
Road Works and events in and around Willingham 16th to 31st March 2019
Just a reminder that this only includes works that are due to start between 16th – 31st May and longer term works that are still in progress will have been included on previous reports. Alternatively please refer to http://www.roadworks.org which will include details on emergency roadworks.
A14 C2H Road Closures, week commencing 13th May 2019
A14 C2H Road Closures, week commending 6th May 2019
Highways Events
Highways Events in and around Willingham 1st to 15th May 2019
A14 C2H road closures week commencing 29th April 2019
A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
Construction work on the new A14 Cambridge to Huntingdon scheme is underway. We are currently carrying out a variety of tasks for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.
For this week, the planned closures are:
Full closures
Monday 29 April to Friday 3 May (five nights)
• A1 northbound between Buckden and Alconbury
Vehicles will travel east on the A428, north on the A1198, west on the A14 and then north on the A14 link road to re-join the A1
• A1 southbound between Alconbury and Buckden
Vehicles will be diverted south on the A14 link road, then east on the A14, south on the A1198 and west on the A428 to re-join the A1
• A14 eastbound between Ellington junction 20 and Brampton Hut junction 21
Vehicles will be diverted east on the A605 then south on the A1(M) to the A605 to re-join the A14 at junction 21.
Non motorway traffic will be diverted east at Wooley Hill, then north on Ellington Road and Wooley Road to re-join the A14.
• A14 westbound between Six Mile Bottom junction 36 and Histon junction 32
Motorway traffic will travel south on the A11, west on the A505 and then north on the M11.
Non motorway traffic will diverted on local roads through Cambridge
• A14 eastbound Bar Hill junction 29 exit slip
Vehicles wishing to leave the A14 at Bar Hill will need to exit the road at Swavesey junction 28 and return on the A14 westbound
Monday 29 April to Wednesday 1 May (three nights)
• A14 eastbound Histon junction 32 to Milton junction 33
Vehicles will be diverted along Kings Hedges Road to re-join the A14
Monday 29 (one night)
• Dry Drayton Road, Oakington
Wednesday 1 and Friday 3 May (two nights)
• Dry Drayton Road overbridge
For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-about/ , or stay updated by following us on https://twitter.com/a14c2h and https://en-gb.facebook.com/A14C2H/.