Please see below the works scheduled for Cambridgeshire. Further information on the roadworks around the area are in the links below and on one.network
The main streets affected in Willingham are:
30.7.2025 – one day only – UK Power Networks – Rampton Road – Temporary obstruction 15 minute delay
28.7.2025 – 15.8.2025 – highways repair and maintenance – traffic lights – Over Road /High Street/Berrycroft/Station road crossroads
28.7.2025 – 22.8.2025 – Utility asset works – Thodays Close