A14 C2H road closures week commencing 29th April 2019

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
Construction work on the new A14 Cambridge to Huntingdon scheme is underway. We are currently carrying out a variety of tasks for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.
For this week, the planned closures are:
Full closures
Monday 29 April to Friday 3 May (five nights)
• A1 northbound between Buckden and Alconbury
Vehicles will travel east on the A428, north on the A1198, west on the A14 and then north on the A14 link road to re-join the A1
• A1 southbound between Alconbury and Buckden
Vehicles will be diverted south on the A14 link road, then east on the A14, south on the A1198 and west on the A428 to re-join the A1
• A14 eastbound between Ellington junction 20 and Brampton Hut junction 21
Vehicles will be diverted east on the A605 then south on the A1(M) to the A605 to re-join the A14 at junction 21.
Non motorway traffic will be diverted east at Wooley Hill, then north on Ellington Road and Wooley Road to re-join the A14.
• A14 westbound between Six Mile Bottom junction 36 and Histon junction 32
Motorway traffic will travel south on the A11, west on the A505 and then north on the M11.
Non motorway traffic will diverted on local roads through Cambridge
• A14 eastbound Bar Hill junction 29 exit slip
Vehicles wishing to leave the A14 at Bar Hill will need to exit the road at Swavesey junction 28 and return on the A14 westbound
Monday 29 April to Wednesday 1 May (three nights)
• A14 eastbound Histon junction 32 to Milton junction 33
Vehicles will be diverted along Kings Hedges Road to re-join the A14
Monday 29 (one night)
• Dry Drayton Road, Oakington
Wednesday 1 and Friday 3 May (two nights)
• Dry Drayton Road overbridge
For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-about/ , or stay updated by following us on https://twitter.com/a14c2h and https://en-gb.facebook.com/A14C2H/.

A14 C2 Road Closures – week commencing 18th March 2019

A14C2H closures w.c 18.03.19

 Additional closure:

 Wednesday 20 – Thursday 21 (two nights)

  • High Street Boxworth, between A14 site compound and Cambridge Services roundabout

 Cancelled closures:

 Saturday 23 6am – Monday 25 5am

  • A1 southbound Brampton Hut to Buckden

 Saturday 23 – Sunday 24 (two nights)

  • A14 eastbound Swavesey junction 28 to Bar Hill junction 29
  • A14 westbound Bar Hill junction 29 to Swavesey junction 28

Highways Events in and around Willingham March 2019

Highways Events – April 2019

Please find attached April 2019 Highway Events Diary. This month has seen a large number of applications reaching us and therefore the 2019 diary has expanded. Please take a moment to review the attached and if you have any questions please do get in touch.

Coming up:

East of England Showground 11th – 13th June 2019, Plantworx

*Please remember details of all highway events can be found on https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/highway-events/

Key event dates

28th April – St George’s Fayre March

5th May – Fen Drayton 10K

12th May – Sawston Charity Fun Run

25th and 26th May – The Duxford Air Festival

1st – 2nd June – Tour of Cambridgeshire

7th July – Race for Life, Cambridge

2nd July – Cambridge County Show (Wimpole Hall Farm)

1st August – Cambridge Folk Festival (Cherry Hinton Hall)

20th October – Cambridge Town and Gown